Construction of First Domestic Water Recycling Plant Launched in Changsha
2016-12-20 18:00:05
The construction of Hunan Yanghu Water Recycling Plant was officially launched on the afternoon of August 9. It is the first water plant that adopts the ecological technology "traditional secondary biochemical treatment--- constructed wetland plus natural wetland" in China.
The plant is a demonstrative project of the "Two-Oriented" Society construction at the pilot area on the west bank of Xiangjiang River and the key eco-environment engineering. Based on the traditional secondary biochemical treatment technology, three aquatic plant ponds and 12 wetlands will form a special aquatic ecosystem to perform secondary sewage treatment, which can purify the water and absorb odor in the plant. The treated water can reach primary A level, representing the first case of water recovery in the province.
It is learned that the 50-square-kilometer water recycling plant (including the Changsha Yanghu District and Hanpu District) now has a daily sewage treatment capacity of 40 thousand tons, which is expected to reach 120 thousand tons in 2020.
Translator: Wang Bilian
Source: Hunan Official Web Portal
Keyword:
-
Zhangjiajie package service for family self-help tourism5D 4N $0.00¥0.00
-
3N4D Zhangjiajie mountaintop staying for highlight sunrise tour4D 3N $241.74¥1580.00
-
4D3N Family tour to ZJJ avatar park-Grand cayon-Glass bridge-Tianmenshan4D 3N $302.94¥1980.00
-
3N4D Group tour for Zhangjiajie rock climbing tour in avatar park4D 3N $0.00¥0.00
more FAQ
- 1About Full introduction for Zhangjiajie Glass Plank Road
- 2What is Zhangjiajie's sister World Geopark?
- 3Top 5 places for Zhangjiajie winter tour
- 4Zhangjiajie top 5 hiking places
- 5Zhangjiajie's best places for sunrise & sunset tour
- 6Do you know about Zhangjiajie cultural heritage?
- 7Zhangjiajie travel entrance fee,cableway,elevator,sightseeing train cost
- 8Hunan Province Weather Profile